Protected Site
|
Moving Timbers to Site
|
Timber Crew
|
Collapsed Tunnel Entrance
|
Roof Slab #2 Being Cleared (Tahna, Kimberley, Linda)
|
Nan at Sifter
|
Nan, Kimberley, Finishing Slab #2, Beginning Slab #3
|
Craig (Archaeologist) Digging Excavation Unit #3 (West Side)
|
Craig Examining Sifted Remains
|
Craig Examining Sifted Remains
|
"Official" Photo of EU#3
|
Craig Working EU #6 (East Side)
|
Craig, Linda Sifting Soil from "Pen" Test Pit (East Side)
|
Kimberley, David, Peter Planning the Days Work
|
David, Peter at the Just Discovered Charcoal Layer
|
Kimberley, Peter Taking Sterile Sample of the Charcoal Layer, West Wall
|
Peter Removing Front Section of West Wall
|
West Wall Showing Removal Levels with Reuilding Started at the Back
|
West Wall First Course - Faced Stone of 87cm Found at Entrance
|
Details of this Faced Stone
|
Details of this Faced Stone
|
|
Town Delivering Another Load of Trap Rock
|
Kimberley Working on the West Wall Faced Stone
|
Faced Stone, West Wall
|
West Faced Stone Being Levered Back into Upright Position
|
West Wall Rebuilding, Looking Through Tumbled East Wall. Roof Slab One is Above
|
West Wall Rebuilding
|
East Wall
|
More Sifting, Kimberley, Linda
|
Tim, Tahna, Linda Picking Trap Rock, Looking Under Roof Slabs
|
Getting Started on the East Wall
|
Nearly Done with the East Wall
|
Master Masons, Finishing Touches are all that is needed, but it's starting to rain
|
East Wall
|
East Wall Was Found to Have a Matching Faced Stone at the Entrance
|
East Wall Faced Stone
|
Completed Restoration
|
|
|
Moving Timbers to Site
|
Moving Timbers to Site
|
Tunnel Entrance with Cribbing Timber
|
Entrance, Cribbed, Roof Slab #1 exposed (Linda)
|
Kimerley Schlepping Dirt Buckets
|
Nan, Kimberley Finishing Slab #2, from above
|
Excavation Unit #3, #2 (West Side), from back
|
Craig at Work
|
Sifter
|
Craig and Linda
|
Craig, Linda, Tasha EUs #2 & #3 (West Side)
|
Aditional Cribbing Used to Raise Roof Slab #1
|
Craig, Linda Sifting Soil from "Pen" Test Pit (East Side)
|
Peter Working on the West Wall, from the Pit Area
|
The Charcoal Layer, behind West Wall
|
Michael, Kimberley at the Sifter
|
David Rebuilding Lower Level of West Wall
|
West Wall Rebuilding Showing Trap Rock and Gravel on the Outer Side
|
Details of this Faced Stone
|
Details of this Faced Stone
|
Details of this Faced Stone
|
Tom, Kimberley, Tim, David, Peter on a VERY Busy Morning
|
Taking Measurements of the Faced Stone
|
Faced Stone, West Wall
|
Upright Again
|
West Wall Rebuilding
|
Lunch Break
|
Nan, Tim Back to the Sifting
|
Tim, Linda Toting Gravel Filled Buckets
|
Finishing Up the Front of the West Wall
|
Peter, David on the East Wall
|
Cribbing Coming Down
|
East Wall
|
Looking Through to East Wall
|
East Wall Faced Stone, 90cm
|
Back to Sifting, Linda, Tom
|
Completed Restoration
|
|